Invest

in Bengkulu

Kaur Mini Hydro Power Plant Project

The Muara Sahung Mini-Hydro Power Plant provides 10 MW of clean energy with minimal environmental impact, reducing reliance on oil-fueled power in Bengkulu.

Back
Project Description

As the world’s population increases, the use of energy continues to grow. By increasing awareness of climate change and the need to reduce greenhouse gas emissions, micro hydropower offers a cleaner alternative to fossil fuel-powered power plants. Micro hydropower uses water flow from rivers or small channels to generate electricity. It is an environmentally friendly renewable energy resources. Micro hydropower plants given to have a smaller environmental impact than large hydropower plants because they do not require large dams or reservoirs. This also allows for the maintenance of natural river flows and reduces disruption to local ecosystems. The planned reliable discharge is about 26 m3/s in the Air Luas Catchment Area in the planned location of Muara Sahung Mini-Hydro Power Plan with the probability of 59% and the head neto of 43 m, therefore the power needs of about 10 MW. With the Mara Sahung Mini-Hydro Power Plant applied capacity of 3 x 3,30 MW, and will produce energy per year of 58,719 GWh, with the capacity factor of 66%. According to the information from the T. PLN South Sumatera, Jambi and Bengkulu Region, the interconnection point is located in JTM Kemuning, about 1 Km from the Mini-Hydro Power Plant location. This project will be feasible to be build to fulfill the electricity power in Bengkulu Province and play a part in the effective operational cost of the PLN South Sumatera, Jambi and Bengkulu region because it will replace the oil fueled thermal power plant.

Key Investment Highlight
Location Serdang Indah Village, Luas, Kaur
Estimated Investment Value IDR 340.7 Billion / USD 22.4 Million USD (10 MW estimated will produced energy per year 58,719 GWh)
Total Area/Land Status 52 Hectare
Business Scheme -
Project Owner Government of Kaur Regency
Financial Feasibility NPV = IDR 47.764.03 IRR = 14,417% Payback Period = 6 year
Project Owner

Government of Kaur Regency

Contact Person
Name Saryoto
Occupation Government (DPMPTSP)
Phone +62 821-8285-5295
Email ptgemamuaraenergi2023@gmail.com

Investment Procedure

Investing in Bengkulu is now more accessible and efficient thanks to the Online Single Submission (OSS) system, which simplifies the process of document submission and compliance with investment regulations. Prospective investors are required to obtain the “Akta Pendirian Perusahaan,” register with AHU Online, maintain an active OSS account with all necessary documents, and secure a Nomor Induk Berusaha (NIB) and a business license by providing comprehensive company information and fulfilling self-declared commitments for various operational permits. The Indonesian Investment Coordinating Board (BKPM) enhances the investment appeal of Bengkulu by offering attractive benefits and incentives, as outlined in Governor Regulation Number 36 of 2021.

See more

Need more help?

Contact Us